This is a completely unsupported modification. It is very simple and it works. This is on our operator console. If I was to do it at a customer site I would use a hacksaw to make the cuts neater.
Requirements:
- One fine tooth hacksaw
- Glue gun
- Q 2 Tilt bases
Install base as normal on phone. On sidecar remove material at top and bottom as required to prevent overlap. Remove plastic for key hole insertion on 561M that overlaps to host phone. Use hot glue at joint (not required but works best) as shown.

Member Since:
2007-12-17